Project
Consultancy and proof ckecking/testing
- A comprehensive Report on the Reinforced
Soil Retaining Walls for four Laning including
Strengthening of existing two lanes pavement from Gurgaon
on Naryana (Km. 36.630) to Kotputli
in Rajasthan (Km. 162.500) on NH-8, under National Highway Authority of
India, 2003.
- Design of Raw Water Reservoir at Ispat Industries Ltd. Dolvi
2002.
- Consultancy for Channel Protection Work
at J.K. Chemical Nalla, Mumbai Municipal
Corporation 2000.
- Design and Construction of Road Work
using Geosynthetics at Dolvi Plant Complex,
2002.
- Report on Ground Improvement for
Approaches of the Flyover for Development of Adequate Road Connecting to Visakhapatnam
port; 2004.
- Construction of additional link in Visakhapatnam port- RAMP-CA. (Design for RAMP-Left and
Right side Walls). 2004
- Report on prefabricated vertical Drain
for Soil Improvement at Chain age 17.60km (Project: Widening of 4-6lanes
and strengthening of existing 2 lanes carriaway of NH-6 in the state of WB from km 17-6 to 72.00 package WB-1, 2003.
- A Comprehensive Report on the Reinforced
Soil Retaining Walls for four Laning including
strengthening of existing two lanes pavement from Raniganj
(Km 474.00) to Panagarh (Km 515.236) section of
NH 2, in West Bengal. Under National
Highway Authority of India,
2001.
- Remedial measures for the Settlement
Problem in River Water intake RCC Tunnel for overseas project. TPK (India),
2002.
- Consultancy Report on Design and Detail
Engineering for the Construction of Reinforced Soil approaches to R.O.B at
Ch. 97.900 on NH-8 for 4 Laning of NH-8 from Gurgaon to Kotputli, NH-8.
Under National Highway
Authority of India.
- Construction for installation methodology
and supervision for Reinforced Soil Structure for Approaches of ROB at Murtizapur, 2000.
- Consultancy for design of Reinforced
Earth Wall for the construction of R.O.B. at Hasanpura
Road Railway Crossing near Jaipur junction
Railway Station at Jaipur.
- Report on proof-checking of designs and
drawings of segmental reinforced soil retaining walls for the project
“Design, Engineering, Construction, Development, Finance, Operation, and
Maintenance of Km 108/700 to Km 192/000 on Vadodara-Bharuch
[Ref: 19A to 19J - For Flyover at chainages
112,116,119,122,125,130,140,153,168,191 Kms
Section of NH-8 in the state of Gujrat on BOT
basis” for the approaches to Flyover and Underpass. – [For Flyover at
chainages 181 Km and Underpass at chainages 114 Km] project no.19, Total
structure = 14
- Report on proof-checking of designs
[Part-I, Part-II, Part-III] and drawings of segmental reinforced soil
retaining walls for the project “Andhra Pradesh Package-II, Jadcherla to Kottakota
(80+000 to 135+740, )” Hyderabad for the approaches to Flyovers and
ROB.[Ref: -24A,24B,24C],- For Flyovers at chainages 80+732.440 and 92+840.013
Km, R.O.B. at chainages 87+250 Km]
project no.19, Total structure = 3.
- Report on proof-checking of designs
[Part-I, Part-II, Part-III] and drawings of segmental reinforced soil
retaining walls for the project “Palanpur-Swaroopganj
Road project on NH-A4(Km 264.00 to KM 340.0);flyover at CHAINAGES km 295
,296 , underpass at CHAINAGES km 266,268,281,288,299,304,310,323,334 and
ROB at CHAINAGES KM 330, Project No. 20, Total structure = 10.
- Rehabilitation and upgrading of 4-lane
divided carriageway configuration of east-west corridor in the state of Rajasthan-(Km.
246.800 to Km.. 340.000 of NH-14
and Km. 0.000 to Km.104.724
of NH-76)—Testing of geogrid material