Project Consultancy and proof ckecking/testing

 

  • A comprehensive Report on the Reinforced Soil Retaining Walls for four Laning including Strengthening of existing two lanes pavement from Gurgaon on Naryana (Km. 36.630) to Kotputli in Rajasthan (Km. 162.500) on NH-8, under National Highway Authority of India, 2003.
  • Design of Raw Water Reservoir at Ispat Industries Ltd. Dolvi 2002.
  • Consultancy for Channel Protection Work at J.K. Chemical Nalla, Mumbai Municipal Corporation 2000.
  • Design and Construction of Road Work using Geosynthetics at Dolvi Plant Complex, 2002.
  • Report on Ground Improvement for Approaches of the Flyover for Development of Adequate Road Connecting to Visakhapatnam port; 2004.
  • Construction of additional link in Visakhapatnam port- RAMP-CA. (Design for RAMP-Left and Right side Walls). 2004
  • Report on prefabricated vertical Drain for Soil Improvement at Chain age 17.60km (Project: Widening of 4-6lanes and strengthening of existing 2 lanes carriaway of NH-6 in the state of WB from km 17-6 to 72.00 package WB-1, 2003.
  • A Comprehensive Report on the Reinforced Soil Retaining Walls for four Laning including strengthening of existing two lanes pavement from Raniganj (Km 474.00) to Panagarh (Km 515.236) section of NH 2, in West Bengal. Under National Highway Authority of India, 2001.
  • Remedial measures for the Settlement Problem in River Water intake RCC Tunnel for overseas project. TPK (India), 2002.
  • Consultancy Report on Design and Detail Engineering for the Construction of Reinforced Soil approaches to R.O.B at Ch. 97.900 on NH-8 for 4 Laning of NH-8 from Gurgaon to Kotputli, NH-8. Under National Highway Authority of India.
  • Construction for installation methodology and supervision for Reinforced Soil Structure for Approaches of ROB at Murtizapur, 2000.
  • Consultancy for design of Reinforced Earth Wall for the construction of R.O.B. at Hasanpura Road Railway Crossing near Jaipur junction Railway Station at Jaipur. 

 

  • Report on proof-checking of designs and drawings of segmental reinforced soil retaining walls for the project “Design, Engineering, Construction, Development, Finance, Operation, and Maintenance of Km 108/700 to Km 192/000 on Vadodara-Bharuch [Ref: 19A to 19J - For Flyover at chainages 112,116,119,122,125,130,140,153,168,191 Kms Section of NH-8 in the state of Gujrat on BOT basis” for the approaches to Flyover and Underpass. – [For Flyover at chainages 181 Km and Underpass at chainages 114 Km] project no.19, Total structure = 14

 

  • Report on proof-checking of designs [Part-I, Part-II, Part-III] and drawings of segmental reinforced soil retaining walls for the project “Andhra Pradesh Package-II, Jadcherla to Kottakota (80+000 to 135+740, )” Hyderabad  for the approaches to Flyovers and ROB.[Ref: -24A,24B,24C],- For Flyovers at chainages 80+732.440 and 92+840.013 Km,  R.O.B. at chainages 87+250 Km] project no.19, Total structure = 3.

 

  • Report on proof-checking of designs [Part-I, Part-II, Part-III] and drawings of segmental reinforced soil retaining walls for the project “Palanpur-Swaroopganj Road project on NH-A4(Km 264.00 to KM 340.0);flyover at CHAINAGES km 295 ,296 , underpass at CHAINAGES km 266,268,281,288,299,304,310,323,334 and ROB at CHAINAGES KM 330, Project No. 20, Total structure = 10.

 

  • Rehabilitation and upgrading of 4-lane divided carriageway configuration of east-west corridor in the state of Rajasthan-(Km. 246.800 to Km.. 340.000 of NH-14  and  Km. 0.000 to Km.104.724 of NH-76)—Testing of geogrid material